Aqaba Southern Entrance
Supply and Install a Packaged Wastewater Treatment Plant
(30 m3/day).
The scope included:
-
Pumping Station
-
Biological Secondary treatment
-
Tertiary treatment (Media filter and disinfection System.
Supply and Install a Packaged Wastewater Treatment Plant
(30 m3/day).
The scope included:
Pumping Station
Biological Secondary treatment
Tertiary treatment (Media filter and disinfection System.