PSD Chalets | Wakileh
top of page

Public Security Directorate Chalets

A turnkey project for the design, construction and installation of a Sewage Treatment Plant, activated sludge process based on the Sequencing Batch Reactor Technology (SBR) having the capacity of 60 m3/day.

The scope included:

  • Construction works which included inlet structure, process tanks, , treated water storage tank, electromechanical rooms and the connection to the sewer network.All Tanks are closed reinforced concrete tanks.

  • Mechanical works which included: Aerators, mixers, pumps, screening, hypochlorite disinfection system and Filters.

  • Electrical, Instrumentation & SCADA for local and remote monitoring and controlling. Works included MCC Motor Control Center with PLC for a fully automatic un-manned operation. Instrumentation including ultrasonic transmitters.
     

bottom of page