Queen Alia International Airport
General Rehabilitation and upgrade of (1800 m3/day) WWTP
The scope included:
-
Manufacturing & replacement of a the scraper & the scum outlet.
-
Foam fighting pump & sprinklers,
-
Construction of rooms and walkways.
-
Repair, sand blasting, epoxy treatment and sealing of the steel process tanks.
-
Installing sand filters and disinfection system.
-
Construction and Installation of grit removal System.
-
Upgrade of biological process and mixing system.
-
Upgrade of aeration system and installation of automatic turbo air blowers.