top of page
Balqaa’ Rehabilitation Center
Turnkey Project of a 2 streams Wastewater Treatment Plant (300 m3/day).
​
The scope included:
Design & construction of the Inlet Structure, with flow measurement.
Balancing Tank, Aeration tanks (2), Sedimentation Tanks (2), Sludge Tank, Chlorine Contact Tank, Effluent Storage / Irrigation Tank, Service Building, Mechanical Rooms, Fences & Gates, Pipe Laying & Cable Laying. Equipment included Bar Screens, Air Blowers, course bubble diffusers mixing system, fine bubble diffusers Aeration System, Sand Filters & Pumps, Irrigation Pumps, Disinfection System (Hypochlorite), MCC + PLC + GSM Modem.
![wastewater treatment plant](https://static.wixstatic.com/media/9af8b3_d69f8aee5f874768861685cc8995bda4~mv2.jpg/v1/fill/w_144,h_81,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/9af8b3_d69f8aee5f874768861685cc8995bda4~mv2.jpg)
wastewater treatment plant
![sewage treatment plant](https://static.wixstatic.com/media/9af8b3_9e0acee8251547c1b440f6fdc2afb393~mv2.jpg/v1/fill/w_144,h_81,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/9af8b3_9e0acee8251547c1b440f6fdc2afb393~mv2.jpg)
sewage treatment plant
![wastewater treatment plant](https://static.wixstatic.com/media/9af8b3_bf1076204a5a49429cab2cd4ebb76a82~mv2.jpg/v1/fill/w_144,h_81,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/9af8b3_bf1076204a5a49429cab2cd4ebb76a82~mv2.jpg)
wastewater treatment plant
![wastewater treatment plant](https://static.wixstatic.com/media/9af8b3_d69f8aee5f874768861685cc8995bda4~mv2.jpg/v1/fill/w_144,h_81,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/9af8b3_d69f8aee5f874768861685cc8995bda4~mv2.jpg)
wastewater treatment plant
1/3
bottom of page